Case study 3: +8% OEE, +9% Production, +₹0.7 Crore/Day Revenue: The Power of Real-Time Efficiency

Through real-time monitoring, smarter planning, and operator training, EroNkan helped a leading manufacturer achieve higher equipment availability, better performance, and a 9.27% production increase.

Through real-time monitoring, smarter planning, and operator training, EroNkan helped a leading manufacturer achieve higher equipment availability, better performance, and a 9.27% production increase.

Introduction

Introduction

  • OEE data analysis conducted across multiple production cycles by Eronkan

    team.

  • Collaborated with client’s operations team to deliver targeted recommendations.

  • Client implemented real-time monitoring to optimize efficiency.

  • Improved production planning to maximize availability and resource use.

  • Reduced downtime through refined planning processes.

  • Operators trained to run machines at standard speeds for consistency.

Observations

Observations

  • Data analyzed for one week.

  • Most lines showed performance <85%, some even <70%.

  • Machine-level analysis showed high no combination counts due to:

    • 1–3 hoppers disabled by operators.

    • Tight target weight range for higher-value products.

    • Uneven product distribution caused by low product drop and improper

      feeder vibration settings.

  • Improvement potential: >32 tons/day packing capacity across 7 lines.

Improvement in Overall Equipment Efficiency

Improvement in Overall Equipment Efficiency

  • Baseline (17–19 May):

  • After Improvements (28–30 May):

  • Significant improvements achieved in both availability and performance,

    resulting in a strong OEE gain.

OEE Baseline & Improvement Data

OEE Baseline & Improvement Data

Improvement In Production

Improvement In Production

The improvements in Overall Equipment Efficiency (OEE) directly translated into

higher production output. Comparing baseline and improvement periods shows a

clear positive correlation:


OEE Improvement: +8.09% (from 64.29% 72.38%)

Production Output Increase: +9.27%

This demonstrates that operational corrections, maintenance efforts, and proper

training not only enhanced equipment efficiency but also delivered tangible gains

in production.

The improvements in Overall Equipment Efficiency (OEE) directly translated into

higher production output. Comparing baseline and improvement periods shows a

clear positive correlation:


OEE Improvement: +8.09% (from 64.29% 72.38%)

Production Output Increase: +9.27%

This demonstrates that operational corrections, maintenance efforts, and proper

training not only enhanced equipment efficiency but also delivered tangible gains

in production.

The improvements in Overall Equipment Efficiency (OEE) directly translated into

higher production output. Comparing baseline and improvement periods shows a

clear positive correlation:


OEE Improvement: +8.09% (from 64.29% 72.38%)

Production Output Increase: +9.27%

This demonstrates that operational corrections, maintenance efforts, and proper

training not only enhanced equipment efficiency but also delivered tangible gains

in production.

Observations

Observations

An 8.09% improvement in OEE directly translated into higher production output.

The rise in production figures highlights the positive impact of equipment

efficiency on overall performance, validating the strong correlation between

improved OEE and increased productivity for the organisation.

Overall Improvement

Overall Improvement

By improving Performance (+3.04%), Availability (+6.15%), and OEE (+8.09%), the

overall average production increased by 9.27%, translating to a daily output boost

of 33.24 tons. These improvements directly enhanced operational efficiency and

productivity, driving a significant increase in overall production output.

Highest Production 11th May

Highest Production 11th May

Availability: 81.33% | Performance: 91.54%

OEE: 74.45% | Production Output: 430.52 tons


  • Clear correlation observed — higher OEE directly boosted production

    performance.

  • Insights empower the client to focus on OEE optimisation for sustained

    productivity and operational success.

Increase In Revenue

Increase In Revenue

Improvements in OEE and production output are projected to generate an

additional revenue of approximately ₹0.7 Crore per day, clearly demonstrating the

significant financial gains that can be achieved through enhanced equipment

efficiency.

Want The Entire Breakdown?

Want The Entire Breakdown?

Want The Entire Breakdown?

Enter your email to unlock the case study, including metrics, implementation steps, and ROI proof.

Enter your email to unlock the case study, including metrics, implementation steps, and ROI proof.

Enter your email to unlock the case study, including metrics, implementation steps, and ROI proof.